| _Otszogletu_kek_tabla.svg.png.webp) | |
|---|---|
| M2-es autóút | |
|   in use  planned  other highways | |
|  M2 near Budapest | |
| Route information | |
| Part of  E77 | |
| Length | 30 km (19 mi) 71 km (44 mi) planned | 
| Existed | 1996–present | 
| History | Expansion: 2017–19 | 
| Major junctions | |
| From | _Otszogletu_kek_tabla.svg.png.webp) M0 near Budapest | 
| 
 | |
| To | Parassapuszta (Hont) (planned)  R3 border with  Slovakia | 
| Location | |
| Country | Hungary | 
| Counties | Pest, Nógrád | 
| Major cities | Budapest, Dunakeszi, Vác | 
| Highway system | |
| 
 | |
The M2 expressway (Hungarian: M2-es autóút) is a toll highway in northern Hungary, connecting Budapest to Vác and Banská Bystrica. The first section of the highway opened in 1996. It follows the route of the old Route 2 one-lane highway. The total length of the motorway now is 30 km.
Timeline
| Section | Length | Opened | Notes | 
|---|---|---|---|
| Budapest (M0) – Vác észak | 30.0 km (18.64 mi) | Single carriageway: 1998 Second carriageway: 1 October 2019 | Built between 1996 – 1998. Originaly the name of the route was 2A, and 2B. Both carriageways were fully built between 2017 – 2019 until Vác dél junction. | 
| Vác észak – Hont-Parassapuszta (border) | 41 km (25.48 mi) | Planned | 
Route description
- The route is expressway. The maximum speed limit is 110km/h, with  (2x2 lane road) until Vác dél junction. (2x2 lane road) until Vác dél junction.
| County | km | Type | Destination | Notes | |
|---|---|---|---|---|---|
|  Budapest | 17 |  | _Otszogletu_kek_tabla.svg.png.webp)  M0 / E77 – Budapest, towards to _Otszogletu_kek_tabla.svg.png.webp) _Otszogletu_kek_tabla.svg.png.webp) _Otszogletu_kek_tabla.svg.png.webp) M3 / M4 / M5 +  / 
 | The southern terminus of the  expressway, and E77 route. Distance is measured from the Zero Kilometre Stone monument in Budapest. | |
|  Pest | 21 |  | Dunakeszi / Fót | ||
| 23 |  | Dunakeszi-Tóváros / Fót-Kisalag | |||
| 25 |  | _Otszogletu_zold_tabla.svg.png.webp) Main road 2 – Dunakeszi-Révdűlő | |||
|  | Alagi pihenőhely | parking, petrol station (Shell), motel, café and restaurant pihenőhely means Rest area | |||
| 27 |  | Göd-Iparterület | Ipaterület means Industrial area | ||
| 29 |  | Göd | |||
| 34 |  | Sződliget / Sződ | |||
| 37 |  | Vác dél / Gödöllő, Vácrátót | The northern terminus of the expressway. dél means South | ||
| 39 |  | Vác-Alsóváros, toward to Tahitótfalu / Rád, Vácduka | 1-lane expressway, planned expansion | ||
| 42 |  | Vác-Centrum, Deákvár / Kosd | Centrum means center | ||
| 48 |  | Vác észak, toward to Tahitótfalu / _Otszogletu_zold_tabla.svg.png.webp) Main road 12 – Szob | Northern side of the road. észak means North 1-lane expressway, planned expansion | ||
|  Nógrád | 56 |  | Nőtincs / Nógrád | Planned | |
| 59 |  | _Otszogletu_zold_tabla.svg.png.webp) Main road 2 – Rétság dél | dél means South | ||
| 61 |  | Rétsági pihenőhely | |||
| 65 |  | _Otszogletu_zold_tabla.svg.png.webp) Main road 22 – Rétság észak / Balassagyarmat, Érsekvadkert | észak means South | ||
| 83 |  | Drégelypalánki pihenőhely | planned petrol station | ||
|  | _Otszogletu_zold_tabla.svg.png.webp) Main road 2 – Drégelypalánk | ||||
| 88 |  | Hont-Parassauszta (H) – Šahy (SK) border crossing   R3 / E77 – Banská Bystrica towards to Kraków (PL) | Planned | ||
| 1.000 mi = 1.609 km; 1.000 km = 0.621 mi 
 | |||||
Maintenance
The operation and maintenance of the road by Hungarian Public Road Nonprofit Pte Ltd Co. This activity is provided by this highway engineer.
Payment
Hungarian system has 2 main type in terms of salary:
1, time-based fee vignettes (E-matrica)1, time-based fee vignettes (E-matrica);
- Cars, vans and motorbikes up to 3.5 tonnes only need to buy a single vignette which costs 6,400 Hungarian forint (Ft) for 10 days, 10,360 Ft for 1 month and 57,260 Ft for a year, from 1 January 2024.[1]
2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:
- Type of county vignette - Available section - Pest - full length (17 km – 48 km) 
European Route(s)
| Name | Route | |
|  | 71 km |    Rýchlostná cesta R3 – _Otszogletu_kek_tabla.svg.png.webp) junction  (16) | 
See also
References
External links

- Exit list of M2
- National Toll Payment Services Plc. (in Hungarian, some information also in English)
- Hungarian Public Road Non-Profit Ltd. (Magyar Közút Nonprofit Zrt.)
- National Infrastructure Developer Ltd.
_Otszogletu_zold_tabla.svg.png.webp)


